装修公司吊顶隐蔽工程有哪些步骤

来源:http://www.jnjmzdc.com/添加时间:2018-10-06 15:49:44
1. 木工进场后,施工前先检查基层结构的梁,楼板底部并清除障碍物。然后复核梁底与板底的标高尺寸和设计的标高尺寸有无矛盾和差错。无差错后根据±0.00弹出吊顶、木制品的标高线(水平线)并在墙上注明标高尺寸,允许偏差±3mm。
1. after the carpenter enters the field, check the bottom structure beam, floor bottom and remove obstacles before construction. Then check whether there is any contradiction and error between the elevation of the bottom of the beam and the bottom of the board and the elevation of the design. After error-free, the ceiling and wooden elevation lines (horizontal lines) are popped up according to (+0.00) and marked on the wall with the elevation dimensions. The allowable deviation is (+3 mm).
2. 墙、顶面打木榫眼,间距不大于400mm,固定顶部垂直吊杆不得采用木榫固定,应使用膨胀螺钉,间距不大于400mm,主龙骨间距600mm。严禁在顶楼、卫生间顶面打木榫眼,相应吊顶龙骨以墙面固定为主。
济南家庭装修
2. Wooden mortise holes are made on the wall and top surface, spacing is not more than 400 mm, vertical suspenders on the top of the fixing are not allowed to be fixed with wooden mortise, expansion screws should be used, spacing is not more than 400 mm, spacing of the main keel is 600 mm. It is strictly prohibited to place wooden mortise on the top floor and bathroom top, and the corresponding ceiling joists are mainly wall fixed.
3. 根据设计要求吊顶龙骨下料,下料后吊顶木龙骨涂刷二遍以上防火涂料,完全遮盖龙骨,吊顶中的预埋件、吊钢筋、靠墙木龙骨都应有防腐防锈措施。
3. According to the design requirements, the suspended ceiling keel is cut, and the suspended ceiling keel is painted with fire retardant paint more than twice after cutting, covering the keel completely. Anti-corrosion and anti-rust measures should be taken for the embedded parts in the suspended ceiling, the suspended steel bars and the wall wooden keel.
4. 吊顶龙骨必须拼接牢固,拼合处宜采用元钉加胶水固定,按图纸要求,对灯孔、空调、通风口、检修孔等加衬龙骨满足结构安全要求。
4. The suspended ceiling keel must be stitched firmly, and the joint should be fixed by the element nail and glue. According to the drawings, the lining keel such as lamp hole, air conditioning, vent and overhaul hole can meet the structural safety requirements.
5. 吊顶木龙骨宜采用无扭曲的红、白松木,以及轻钢龙骨,不准使用黄花松木。大面积室内吊顶的主龙骨宜为50mm*50mm,次龙骨30mm*50mm或40mm*50mm,较小面积吊顶采用25*30mm木龙骨架。
5. The suspended ceiling wooden keel should adopt non-twisted red and white pine, and light steel keel, not yellow pine. The main keel of large area indoor ceiling should be 50mm * 50mm, the secondary keel 30mm * 50mm or 40mm * 50mm, and the smaller area ceiling should be 25 * 30MM wooden keel.
6. 安装固定龙骨时中间部分应起拱,大面积吊平顶应按房间短向跨度的1/200起拱,主龙骨安装后应及时校正其位置和标高。曲线型吊顶,曲线部分不允许出现拐点,保证曲线流畅。
6. When installing and fixing the keel, the middle part should be arched, the large-area suspended flat roof should be arched according to 1/200 of the short span of the room, and the position and elevation of the main keel should be corrected in time after installation. Curve shaped ceiling, the curve part does not allow an inflection point to ensure that the curve is smooth.
(1)吊杆距主龙骨端部距离不得超过300mm,否则应增设吊杆,平面吊顶一般间距为1000mm,迭级式吊顶应在迭级交接处布置吊杆。当吊杆与设备相遇时,应调整吊点或增设吊杆,避免与中央空调等震动设备相接触。
(1) The distance between the hanger rod and the end of the main keel should not exceed 300 mm. Otherwise, the hanger rod should be added. The general distance between the plane ceiling and the stacked ceiling should be 1000 mm. The hanger rod should be arranged at the junction of the stacked ceiling. When the boom meets the equipment, the lifting point should be adjusted or the boom should be added to avoid contact with the vibration equipment such as central air conditioning.
(2)封板前必须进行隐蔽验收。
(2) covert inspection must be carried out before sealing.

上一篇:浅析家庭装修墙面装修常见方法
下一篇:你知道用瓷砖装修家里的原因吗?

  • 公司名称:济南聚铭宅装饰有限公司   
  • 电话:13953144313  QQ:616391450   邮箱:616391450@qq.com
  • 地址:山东省济南市槐荫区刘长路国茂装材市场
  • [声明] 本站图片均由网站所有方提供,部分图片来源于网络,如有任何疑问请及时与我们联系,未经沟通本站不承担相关法律责任!