欢迎来到济南家庭装修聚铭宅装饰有限公司!

  • 座机:
  • 电话:13953144313
  • 网址:http://www.jnjmzdc.com
  • 邮箱:616391450@qq.com
  • 地址:山东省济南市槐荫区刘长路国茂装材市场

行业法规

当前位置:首页 >> 新闻资讯>>行业法规>>

新房从装修到入住要做的流程介绍

来源:http://www.jnjmzdc.com/添加时间:2019-02-18 19:18:00
新房装修流程一--前期规划:
New Housing Decoration Process I - Pre-planning:
首要是依据自己的生活习惯规划,而且对自己的房间进行一次详细的测量,咱们不要犯懒,好亲身测量一遍,测量的内容首要包括:清晰装修进程触及的面积。特别是贴砖面积、墙面漆面积、地板面积;清晰首要墙面标准。特别是今后需求规划摆放家具的墙面标准。
First of all, we should plan according to our living habits and make a detailed measurement of our room. Let's not be lazy. We'd better measure it personally. The main content of the measurement includes: clear the area touched by the decoration process. Especially the area of brick, wall paint, floor area; clear primary wall standards. Especially in the future demand planning furniture wall standard.
新房装修流程二--主体拆改:
New house decoration process II - main body demolition and alteration:
进入到施工阶段,主体拆改是先上的一个项目,首要包括拆墙、垒墙、铲墙皮、拆暖气、换塑钢窗等等。主体拆改说白了,就是先把工地的结构先搭起来。
Entering the construction stage, the main body demolition is the first project, including demolition wall, barrier wall, shovel wall skin, demolition of heating, plastic steel windows and so on. To put it plainly, the main body is to build up the structure of the construction site first.
新房装修流程三--水电改造:
New house decoration process 3 - Hydropower renovation:
水电路改造之前,主体结构拆改应该根本结束了。在水电改造和主体拆改这两个环节之间,一些同学或许知道,还应该进行橱柜的次测量。其实所谓的橱柜次测量并没有什么实际内容,因为墙面和地上都没有处理,橱柜规划师不或许给出详细的规划标准,而只是就开发商预留的上水口、油烟机插座的位置,提出一些相关主张。
济南家庭装修
Before the renovation of the hydropower circuit, the main structure should be completely dismantled. Between the hydroelectric transformation and the main body dismantling, some students may know that the first measurement of cabinets should also be carried out. In fact, the so-called first measurement of cabinets does not have any practical content, because the walls and the ground are not handled, cabinet planners may not give detailed planning standards, but only on the developers reserved water outlet, lampblack machine socket location, put forward some relevant proposals.
新房装修流程四--木匠:
New house decoration process 4 - carpenter:
木匠、瓦工、油工是施工环节的“三兄弟”,根本出场次第是:木瓦油。根本出场准则是——谁脏谁先上。“谁脏谁先上”也是决议家装次第的一个根本准则之一。
Carpenters, bricklayers and oilers are the "three brothers" in the construction process, and their basic appearances are: tile oil. The basic criterion of appearance is who is dirty first. "Who dirty first" is also one of the fundamental criteria for deciding the ranking of home decoration.
新房装修流程
New House Decoration Process
新房装修流程五--泥瓦:
New house decoration process 5 - mud tile:
“瓦工老二”作业的进程,还触及以下三个环节的设备:过门石、大理石窗台的设备。过门石的设备可以和铺地砖一同结束,也可以在铺地砖之后。大理石窗台的设备一般在窗套做好之后,设备大理石的工人会预备玻璃胶,顺手就把大理石和窗套用玻璃胶封住了。地漏的设备。地漏是家装五金件中个出场的,因为它要和地砖共同合作设备。
The process of the "second masonry worker" operation also touches on the following three links of equipment: equipment passing through doorstone and marble windowsill. The equipment for crossing the gate stones can be finished with the floor tiles or after the floor tiles are laid. The equipment of marble windowsill is usually finished after the windowsill is finished. The worker of the equipment marble will prepare the glass glue and seal the marble and windowsill with the glass glue. Equipment for floor drain. The floor drain is the first one to appear in furniture hardware, because it has to cooperate with floor tiles in equipment.
新房装修流程六--油工:
New house decoration process 6 - Oil workers:
“油工老三”出场,首要结束墙面底层处理、刷面漆、给木匠打的家具上漆等作业。至于是否要留终一遍面漆,个人感觉这个问题没必要太较真儿,留一遍面漆的含义不是很大,因为后面的操作没有比刷漆再脏的了。
"Old Three Oil Workers" appeared, the first thing is to finish the work of wall bottom treatment, painting, painting furniture for carpenters and so on. As for whether to leave the final finish, I don't think it's necessary to be too real. The meaning of leaving the finish is not very big, because the operation behind is no dirtier than painting.
新房装修流程七--厨卫吊顶:
New house decoration process 7 - kitchen ceiling:
厨卫吊顶作为设备环节打头阵的,仍是在连续对家的“包装”。在厨卫吊顶的一同,厨卫的防潮吸顶灯、排风扇应该现已买好了。好把厨卫吸顶灯、排风扇一同装好,或许留出线头和开孔。
The kitchen and toilet ceiling, as the first link of equipment, is still in the continuous "packaging" of the home. In the same kitchen and toilet ceiling, kitchen and toilet anti-moisture ceiling lamp, exhaust fan should be bought now. It's better to install the kitchen and toilet ceiling lamp and exhaust fan together. Perhaps the thread head and the hole are left.
新房装修流程八--橱柜设备:
New house decoration process 8 - cabinet equipment:
吊顶结束后,可以约橱柜上门设备了。一同设备的还有水槽(可以不包括上下水件)和煤气灶,橱柜设备之前好协调物业把煤气通了,因为煤气灶装好之后需求试气。
After the ceiling is over, you can make an appointment for cabinet door-to-door equipment. Also equipped with water tank (can not include water parts) and gas stove, cabinet equipment before the best coordination property to gas through, because gas stove installed after the need for gas testing.
本文由济南家庭装修提供技术支持,更多的详细精彩内容请点击我们的官方网站http://www.jnjmzdc.com,我们将会全心全意为您提供满意的服务。
This article is supported by Jinan Family Decoration. For more details, please click on our official website http://www.jnjmzdc.com. We will provide you with satisfactory service wholeheartedly.

上一篇:家庭装修中法式软装需要注意哪些?
下一篇:有关装修风水知识大全!

  • 公司名称:济南聚铭宅装饰有限公司   
  • 电话:13953144313  QQ:616391450   邮箱:616391450@qq.com
  • 地址:山东省济南市槐荫区刘长路国茂装材市场
  • [声明] 本站图片均由网站所有方提供,部分图片来源于网络,如有任何疑问请及时与我们联系,未经沟通本站不承担相关法律责任!