[导读]:1、强电线管走墙,弱电线管走地(或者地上强弱电线管走地,但必须分隔300mm以上),水管尽或许走墙,线槽应横平竖直;  1 Strong and we
1、强电线管走墙,弱电线管走地(或者地上强弱电线管走地,但必须分隔300mm以上),水管尽或许走墙,线槽应横平竖直;
  1. Strong and weak power line pipes walk on the wall, weak power line pipes walk on the ground (or strong and weak power line pipes walk on the ground, but they must be separated by more than 300 mm), water pipes may walk on the wall as far as possible, and troughs should be horizontal and vertical;
  2、暗线敷设必须配管,空心楼板除外(空心楼板用护套线),强弱电不能穿入同一根管内。管内电线应处于宽松状况;
  2. Underground wires must be laid with pipes. Except for hollow floors (hollow floors with sheath wires), strong and weak electricity cannot penetrate the same pipe. In-pipe wires should be in loose condition.
  3、电线管内不得有接头,在水电竣工后,一切开关、插座的明露线头必须用绝缘胶布包好,以免发作触电风险;
  3. There shall be no joints in the wire pipe. After the completion of the hydropower project, the exposed wires of all switches and sockets must be covered with insulating tape to avoid the risk of electric shock.
  4、装置电源插座时,应左零右相(火),上方为地线。火线进开关,零线进灯头;
  4. When installing power socket, it should be left-zero and right-phase (fire), with ground wire above. Fire line entry switch, zero line entry lamp head;
  5、卫生间插座应为防溅型;
  5. The toilet socket should be spatter-proof.
  6、同一室内的电源、电话、电视等插座面板应在同一水平标高上,高差应小于5mm;
  6. The socket panels of power supply, telephone and TV in the same room should be on the same level elevation, and the height difference should be less than 5 mm.
  7、照明用电线为1.5BV,插座用线为2.5BV,接地用线为2.5BVR,空调及特大功率用线为4BV。空调及大功率电器应单独走线;
  7. Lighting wire is 1.5BV, socket wire is 2.5BV, grounding wire is 2.5BVR, air conditioning and high power wire is 4BV. Air conditioning and high-power electrical appliances should be separately wired.
  8、电源插座距地上一般为300mm,开关距地上一般为1400mm,如有特别需求则按特别情况处理(如壁挂式空调插座);
  8. The distance between the power outlet and the ground is generally 300 mm, and the distance between the switch and the ground is generally 1400 mm. If there is a special need, it should be handled according to the special circumstances (such as wall-mounted air-conditioning socket).
  9、煤气管(天然气管),必须走明管,不能封死,如需移管必须由燃气公司进行操作;
  9. Gas pipes (natural gas pipes) must be open and not sealed. If they need to be transferred, they must be operated by gas companies.
  10、进水管全部用热水PPR管,下水管用PVC管。冷热水管应左热右冷;
  10. Hot water PPR pipes and PVC pipes are used for all intake pipes. Cold and hot water pipes should be left hot and right cold.
  11、电线管、热水管、煤气管相互间应保持一定距离,不得紧靠;
  11. Wire pipes, hot water pipes and gas pipes should be kept at a certain distance from each other, not close to each other.
  12、经通水试压(0.8MP/8公斤试压十分钟压降不大于0.05MP/0.5公斤),一切管道、阀门、接头应无渗水、漏水现象;
  12. After water pressure test (0.8MP/8kg pressure test for 10 minutes pressure drop is not more than 0.05MP/0.5kg), all pipes, valves and joints should be free of seepage and leakage.
  13、施工废物要当天袋装并放于指定堆放点,水电工序完成后需清理现场;
  13. Construction waste should be packed and placed at designated storage points on the same day, and the site should be cleaned up after the completion of the hydropower process.
  14、水电竣工后向业主供给管线照片--设计师供给(刻录光盘);
  14. After the completion of the hydropower project, supply the owner with pipeline Photos - the designer supply (CD-ROM burning);
济南家庭装修
  15、水路检验:水改结束,用软管衔接已改造冷热水管,保证是整个室内管道的冷热水管一起镇压;装置好镇压器,镇压器充满水,管内空气放掉,使整个回路里边满是水;封闭水表及外面闸阀(一定要做好保护)。然后开始镇压,实验值为工作压力的1。5倍,30分钟不渗不漏,掉压不超过0.05MP为合格;
  15. Waterway Inspection: After the water reform is over, connect the transformed cold and hot water pipes with hoses to ensure that the cold and hot water pipes of the whole indoor pipes are suppressed together; install a good compressor, the compressor is full of water, and the air in the pipe is released, so that the whole circuit is full of water; close the water meter and the external gate valve (must be well protected). Then the repression was started, and the experimental value was 1 of the working pressure. Five times, no leakage in 30 minutes, no pressure drop less than 0.05 MP is qualified;
  16、强电检验:选用500V绝缘电阻表测验各回路绝缘电阻值,一起可考验所用电线质量,不合格的电线或许会被击穿;
  16. Strong electricity test: 500 V insulation resistor meter is used to test the insulation resistance of each circuit. Together, the quality of the wires used can be tested. The unqualified wires may be broken down.
  17、弱电选用专用工具测验:专用网络测验工具测验网络8芯信号是否畅通;载波器铜轴电缆测验工具,万用表等彻底测验合格后再进行下一步施工工作;
  17. Selection of special tools for weak current testing: special network testing tools to test whether the 8-core network signal is smooth; carrier copper-axle cable testing tools, multimeter and other thorough tests after passing the next step of construction work;
  18、切记水电改造结束:一定要检验,比及其他项目施工结束再发现问题已为时已晚。 水电改造可以说是在家居装饰中重要的一个工程,水电维系着整个家居的正常工作,一旦在检验进程中没有发现问题,那么在入住后出现问题将是一个将为杂乱的修理进程,所以咱们在做好家居装饰的时候,关于水电改造一定要有满足的重视,而且关于做好水电改造之后,关于装饰水电检验一定要做好。
  18. Keep in mind that the hydropower transformation is over: it must be inspected. It is too late to discover the problem after the completion of construction of other projects. Hydropower renovation can be said to be the most important project in household decoration. Hydropower maintains the normal work of the whole household. Once no problems are found in the inspection process, then the problems will be a messy repair process after living. So when we do household decoration well, we must pay enough attention to hydroelectric renovation and do a good job of hydroelectricity. After renovation, the inspection of decorative hydropower must be done well.

上一篇:家庭装修时为了避免甲醛超标一定要注意
下一篇:济南家庭装修-中式装修风格!

  • 公司名称:济南聚铭宅装饰有限公司   
  • 电话:13953144313  QQ:616391450   邮箱:616391450@qq.com
  • 地址:山东省济南市槐荫区刘长路国茂装材市场
  • [声明] 本站图片均由网站所有方提供,部分图片来源于网络,如有任何疑问请及时与我们联系,未经沟通本站不承担相关法律责任!